Under Contract C853/1 for the design and construction of the sewage network branches in Al-Wakra and Al-Wukair, Al-Tamimi Steel (316L) successfully manufactured, supplied, and installed a stainless-steel vortex pipe, composite cover, cladding wall, and flooring system.